Turning and positioning the roof of the Observation Deck (which will house
the Cinema) took place on 31 March 2001. The roof, which was fabricated in a mould, was constructed upside down and had to be flipped over prior to placement. The follwing photo sequence shows the key stages of the process.
 |
| Removing the roof from the bay |
 |
| Beginning the turn |
 |
At mid-turn, the roof is vertical
|
 |
On the way down
|
 |
Positioning the roof over the Observation Deck
|
 |
The roof in place on the Observation Deck
|
|
 |
Webcam Time-lapse.
Composite Superstructure.

January 29, 2001 - Greg and Laura visit.

December 15, 2000 - Blessing of the
Keel.
December 9, 2000 - Turning of the
Keel.
Screen background sized (800x600) image of model. |
 |